1. In continuation of this present Ministry’s General Circular No.23/2020
dated 17.06.2020 [G.C] and after due assessment and it has been chosen to
broaden conspire till 3’1.12.2020. As needs are, the figures ~’30.09.2020″ and
“01.10.2020” any place they show up in the G.C. will be subbed with figures
“31.12.2020” and “01.01.2021” individually.
2. Different prerequisites as referenced in the said roundabout will remain
unaltered.
3. This issues with the endorsement of the equipped power.